Gallery

Check out Independents photo gallery below.

  • Stabiilizer Heat Check Indications
  • UBHO Port Hole Indications
  • Upset Indications
  • Upset Indications
  • Upset Indications
  • Stab Weld Indications
  • Pit Indication on Drive Shaft Mandrel
  • Flange Weld Indications
  • Drill Pipe Friction Weld indication
  • Hard Banding Indication
  • Indications in drive shaft
  • Heat Check Indications 360 degree 8.0" Drive Shaft
  • Multiple indications on Bull Nose tool
  • Thread Indications
  • Multi Directional Indications
  • Crack indications in 2.0" 1502 Hammer union
  • Transverse indications in Sucker Rod upset
  • 5.0" HWDP Pin Upset Crack indications
  • Longitudinal indications on 5.0" Drill pipe pin upset
  • Longitudinal indications on 5.0" Drill pipe pin upset
  • Longitudinal indications on 5.0" Drill pipe pin upset
  • Crack indications on Male Sub 2.0" Choke Valve
  • Crack indications on Male Sub 2.0" Straight Discharge joint
  • Crack indication on flange ring groove
  • Crack indication on flange ring groove
  • Crack indication in lubricator lifting loop
AC Yoke (MPI) Indications
  • 6-5/8 Reg Box indication
  • Black Light Indications
  • Box Indications
  • Pin indications
  • Flow Diverter Indications
  • Drill Collar 6-5/8 Reg Box Indications
  • Drill Collar 6-5/8 Reg Box Indications
  • Mud Motor Bearing Driveshaft Indications
Magnetic Particle Inspection (MPI) Indications
  • (LPI) Indications
  • (LPI) Indications
  • (LPI) Indication
Liquid Penetrant Inspection (LPI) Indications
  • IDC Tyr
  • Des Carling Drilling
  • Riggin Up #1
  • Riggin up #2
  • Riggin up #3
  • Des Carling drilling
  • MBC Rig #16
  • IDC Tyr
  • Big Ben
  • MBC Rig #16
  • Ensign Rig # 931
  • Mast Failed over pulling
  • Mast Failed over pulling
  • Mast Failed over pulling
  • Webster Drilling rig
  • Webster Drilling rig
  • Big Ben Todd Energy operations
Assorted rig Pictures
  • IOISL Inspection
  • Sprint Car
  • Flare Line OZ
  • Night inspection
  • PDC load outs
  • Double Huff
  • Duroweld made IOISL inspection table
  • Bent HWDP
  • Pin Shear off
  • Drill Collar pin connection Shear off
  • Top Drive inspections
  • Halliburton idol
  • Snorky Ruff Rider
  • Waipunga bridge
  • Cat Loader
  • IOISL Inspection Work Shop
  • Galling of box Connection
  • Galling of box Connection #2
  • Pitted Pin Connection
  • Galled Pin NMDC Connection
  • Inspection Any Weather
  • Independent Oilfield Inspection Services
  • Independent Oilfield Inspection Services
  • Independent Oilfield Inspection Services
  • Independent Oilfield Inspection Services
  • IOISL International Pipe Inspectors Association Certification
  • Galled Threads  NC50 Pin Saver Sub
  • Galled Threads  NC50 Pin Saver Sub
  • Ben Tec Top Drive
  • Ben Tec Top Drive inspection
  • CT Reel Coil Inspection
  • On location Drill Pipe Visual Inspection DS1 Cat 2
  • 30.0" Casing out-around
  • 30.0" Casing out-round
  • Scanning Slip area of drill pipe
  • 30.0" Crushed Casing
  • Ultrasonic scan of Slip area DS1 Category 5
  • Preserved Drill Pipe & HWDP
  • Fresh machined connection
  • EMI Inspection of drill pipe tube
  • Pipe Storage
  • IOISL Yard
  • Completed Sub Inspections
Assorted Pictures